Pipelines
Baku-Tbilisi-Ceyhan
The BTC passes over 1,500 river and 13 seismically active fault crossings and climbs to a high point of 2,800 metres before returning to sea level at Ceyhan.
- The pipeline length is 1768km in total length.
- The diameter of the pipeline is 42 inches.
- BTC’s throughput capacity is currently 1.2 million barrels per day.
- The BTC pipeline facilities include: Eight pump stations (two in Azerbaijan, two in Georgia, four in Türkiye),one pressure reduction station, two intermediate pigging stations, 101 block valves.
South Caucasus pipeline
In the first quarter of 2022, the SCP spent around $14 million in operating expenditure and around $0.3 million in capital expenditure in total. The SCP has been operational since late 2006, transporting Shah Deniz gas to Azerbaijan, Georgia and Türkiye.
- The length of the pipeline is 691km, with 443 km in Azerbaijan and 248 km in Georgia.The diameter is a 42-inch.
- South Caucasus Pipeline Company (SCPC) has been responsible for the construction and operation of the whole pipeline.
- The SCP has been operational since late 2006, transporting Shah Deniz gas to Azerbaijan, Georgia and Türkiye.
- The expanded section of the pipeline commenced commercial deliveries to Türkiye in June 2018 and to Europe in December 2020.
Western Route Export pipeline
The length of this pipeline - 829 km WREP facilities include:
- Six pump stations (three in Azerbaijan, three in Georgia)
- BTC’s throughput capacity is currently 1.2 million barrels per day.
- Two pressure reduction stations located in Georgia
- 59 block valves with check valves along the pipeline
- One intermediate pigging station in Azerbaijan and one at each station.
The Western Route Export Pipeline (WREP) transports crude oil from offshore oil fields in the Caspian Sea to the Black Sea, from where the crude is further shipped via tankers through the Bosporus to European markets.